University of Cyprus

Dr. Symeon Christodoulou's Personal Web Page

Äçìïóéåýóåéò

Aslani, P., Christodoulou, S., Griffis, F.H., Ellinas, G., and Chiarelli, L. (2007). “Dynamic-Resource-Constrained Scheduling”. To be submitted to ASCE’s Journal of Computing in Civil  Engineering.

REFEREED JOURNAL PAPERS (IN REVIEW)

(Review Criteria includes (1) At Least Two Reviewers (2) and Opportunity to Implement Corrections)

 

Christodoulou, S. (2007). “Resource-Constrained Scheduling Using Ant Colony Optimization”. To be submitted to ASCE’s Journal of Computing in Civil Engineering.

Christodoulou, S. (2007). “Construction Imitating Ants: Resource-Unconstrained Scheduling With Artificial Ants”. Submitted to ASCE’s Journal of Construction Engineering and Management (Aug. 2007).

Aslani, P., Christodoulou, S., Griffis, F.H., Ellinas, G., and Chiarelli, L. (2007). “Dynamic-Resource-Constrained Scheduling”. Submitted to ASCE’s Journal of Construction Engineering and Management (Sep. 2007).

Christodoulou, S. and Ellinas, G. (2007). “Pipe Network Routing Through Ant Colony Optimization”. Submitted to ASCE’s Journal of Infrastructure Management (Dec. 2007).

Christodoulou, S. and Ellinas, G. (2007). “Reliability Analysis of Piping Networks Using Graph Theory”. To be submitted to ASCE’s Journal of Infrastructure Management.

P3.

P2.

R4.

R3.

R2.

R1.

Aslani, P., Christodoulou, S., Griffis, F.H., Ellinas, G., and Chiarelli, L. (2007). “Activity Prioritization Under Resource Constraints Using a Utility Index Method”. Submitted to Elsevier’s Journal of Automation in Construction (Sep. 2007).

P1.

REFEREED JOURNAL PAPERS (IN PROGRESS)

 

Christodoulou, S. and Deligianni, A. (2007). “Pipe Asset Management Using a Hybrid Neurofuzzy System”. To be submitted to ASCE’s Journal of Water Resources Planning and Management.

P4.

Christodoulou, S. (2007). “Multi-factored Risk-of-Failure Assessment in Pipe Networks by use of the Method of Parzen Windows”. To be submitted to ASCE’s Journal of Water Resources Planning and Management.

P5.

Page 2 of 6

Christodoulou, S., Ellinas, G. and Aslani, P. (2008). “Entropy-Based Scheduling of resource-Constrained Construction Schedules”. Submitted to ASCE’s Journal of Construction Engineering and Management (Jan. 2008).

R5.

R6.

Christodoulou, S., Ellinas, G., and Aslani, P. (2008). “Entropy Considerations in Resource-Constrained Scheduling”. Submitted to Elsevier’s Journal of Automation in Construction (Jan. 2008).